Introducing the new Hyundai IONIQ 6

Introducing the new Hyundai IONIQ 6

Combine work and play with the All-New Hyundai IONIQ 6. With up to 382 miles of range, futuristic contours and a connected interior, this all-electric four-door coupé saloon will help you enjoy all the perks of zero-emissions driving without compromising on practicality or style. Order yours today at Hendy Hyundai!

Fully digital 12.3” cluster
Interactive LED steering wheel
Digital Side Mirrors
Electric vehicle route planner
BOSE premium sound system

Hyundai IONIQ 6

Flowing lines, a rounded silhouette and timeless appeal – what’s not to love about the Hyundai IONIQ 6? This all-electric saloon has a unique aesthetic you’d expect from a concept car, with the finishing touches being the glass-like, transparent elements that reflect the light.

Launching with the IONIQ 6 First Edition: this special version comes with all-wheel drive, an electric sunroof, 20-inch alloy wheels and gloss black trim on the exterior – and much more!

While the smooth exterior makes journeys both more agile and sustainable, the interior is a haven away from your busy lifestyle. Personalise the look and feel with the dual-colour ambient lighting, and stay connected at all times thanks to the modular touchscreen dashboard, with an integrated 12-inch infotainment touchscreen and 12-inch digital cluster.

My buying options

Hendy Hyundai Locations

Choose from 2 Hendy Hyundai Locations

View all

Fancy Something Else?